SCC Preview

This is a preview of the SCC, scheduled to become operational within 2025.

Hardware

40 CPU Nodes

  • 2 AMD EPYC 9334 with 32 Cores each
  • 2.3TB DDR5 RAM
  • HDR100 Infiniband

10 GPU Nodes

  • Same specifications as CPU Nodes
  • 2 NVIDIA H100 NVL with 96GB VRAM each

Storage

Redundant CEPH Storage

  • HDD: 1.6 PB net
  • SSD: 261 TB net